cover image: Example Building, Ottawa ON SUMMARY BUDGET ESTIMATE

20.500.12592/w7xx27

Example Building, Ottawa ON SUMMARY BUDGET ESTIMATE

16 Jan 2023

$/unit Adjustment Comments SF 1 39,163 132 y/n GENERAL REQUIREMENTS 8 .57 9 ,039 y 90.00% 7.72 8,135 - BUILDING & SELECTIVE DEMOLITION - - y 100.00% 14.00 14,760 Demo existing interior space + complete façade - EXCAVATION, FOUNDATIONS & SHORING 4 6.11 4 8,611 n 0.00% - - Existing building assume no foundation upgrades - STRUCTURAL FRAME 6 9.36 7 3,127 y 25.00% 17.34 18,282 Moderate structural modi. [...] This budget assumes that only minor improvements to the structure for MEPF New Construction Comps and façade systems would be required. [...] $/unit Adjustment Comments SF 8 1,233 60 y/n GENERAL REQUIREMENTS 8 .68 1 1,748 y 70.00% 6.07 8,223 - BUILDING & SELECTIVE DEMOLITION - - y 100.00% 6.35 8,597 Demo existing interior space + limited façade - EXCAVATION, FOUNDATIONS & SHORING 4 6.67 6 3,180 n 0.00% - - Existing building assume no foundation upgrades - STRUCTURAL FRAME 7 0.20 9 5,044 y 10.00% 7.02 9,504 Minor structural modifications. [...] - 40.00% 24.15 32,702 Window replacement (ribbon and operables) EXTERIOR WALL 6 0.39 8 1,756 y - INTERIOR CONSTRUCTION 4 4.24 5 9,899 y 100.00% 44.24 59,899 Validate level of finishes, FTF heights - SPECIAL REQUIREMENTS 1 3.07 1 7,696 y 100.00% 13.07 17,696 - 6.04 8,179 Update elevator finishes and mechanics VERTICAL TRANSPORTATION 1 7.26 2 3,368 y 35.00% - FIRE PROTECTION 9 .15 1 2,385 y 90.00% 8. [...] This budget assumes that only minor improvements to the structure for New Construction Comps MEPF and façade systems would be required.
Pages
2
Published in
Canada