cover image: INTERNATIONAL CONSEIL SOURIS RIVER                            BOARD DE LA RIVIÈRE SOURIS

20.500.12592/6jx5p7

INTERNATIONAL CONSEIL SOURIS RIVER BOARD DE LA RIVIÈRE SOURIS

8 Mar 2023

Questions were raised at the Board meeting in the summer of 2020 regarding the process for requesting interim apportionment determinations at the Sherwood Crossing and the process for North Dakota to request a delayed release and request the release of the delayed water. [...] The paper developed by the Ad Hoc Group was provided to the Board and the flow chart was developed using the processes laid out in the paper. [...] The manual has the current methodology for analyzing, calculating, and presenting the apportionment of the water in the Upper Souris Basin between Canada and the United States of America. [...] The presentation also included a motion that the ISRB approve the draft as the current Apportionment Procedures Manual with the understanding that the Hydrology Committee will identify and prioritize changes needed to the current apportionment procedures and develop a work plan to address the required changes, to be presented to the ISRB at their next Board meeting. [...] Davison moved that the ISRB approve the draft as the current Apportionment Procedures Manual with the understanding that the Hydrology Committee will identify and prioritize changes needed to the current apportionment procedures and develop a work plan to address the required changes, to be presented to the ISRB at their next Board meeting.

Authors

Girma Sahlu

Pages
24
Published in
Canada
Title in English
INTERNATIONAL CONSEIL SOURIS RIVER BOARD DE LA RIVIÈRE SOURIS [from PDF fonts]

Tables

All