*Application Form ‐ completed and signed by applicant. [...] Land Title Search ‐ if applicable, copies of restrictive covenants. (If new ownership, provide proof of ownership. I.e. Sales Contract) *Schedule “F” Owner(s) Undertaking ‐ signed by all owners on title. [...] *Agent Authorization Form ‐ signed by all owners on title and completed by the applicant. (Required if there are multiple owners on title) *Consent to Construction Form (If applicable, this form must be completed by the Strata or Landtitle Owners for all units) 2 Sets of Architectural Drawings 2 Sets of Structural Drawings ‐ signed, sealed, dated and permit to pract. [...] *Heritage and Archaeology Checklist Reduced Site Plan ‐ 2 Copies, no larger than 11”x 17”. Letter of Assurance ‐ Schedule B Structural (Original signed, sealed and dated by P. [...] Eng.) Topographical Survey ‐2 Originals, not more than twelve months old. Posting/Subdivision Plan ‐ 2 Originals, not more than six months old. (Not required if posts are confirmed and shown on Topographical Survey) Geotechnical Report ‐ is required for floodplain areas. *Waste Diversion Application Form ‐ required for all demolition permits.
Authors
- Pages
- 2
- Published in
- Canada