The goal of the Updates to the South Saskatchewan River Operational Model (SSROM) and Underlying OASIS Platform project was to update the SSROM Base Case so that the model is reflective of the SSRB as it operates today and to update the underlying modelling platform from the original OASIS platform to the OASIS Enterprise platform. [...] This report lays out the approach taken to update the data in the SSROM, summarizes the model and the data within the model, compares the updated SSROM outputs to those from previous modelling efforts, and finally summarizes future modelling opportunities that can be supported by the SSROM’s strengths. [...] The Working Group meetings were used to confirm data received from the GoA and the irrigation district representatives regarding the current operations of 1 Updates to the SSROM and the underlaying OASIS platform – Final Report the SSRB. [...] From the Blindman River to the Saskatchewan border, the WCO is 45% of the natural flow rate or 16 m3/s in the winter (November 1 to March 31) and 45% of the natural flow rate or 10 m3/s in the summer (April 1 to October 31). [...] The Glenmore Reservoir is fed by the Elbow River, which enters the Bow River downstream of the City of Calgary; the Glenmore Reservoir supplies water for the City of Calgary.

Authors

Alison Regan

Pages
95
Published in
Canada