The CEAB 30 by 30 Working Group At their Fall 2019 meeting, the Engineers Canada Board approved the Strategic Priority’s sub- strategy, which included direction to the CEAB to develop appropriate ways within the accreditation process to incorporate the goals of the 30 by 30 initiative. [...] As the Working Group moved through the task assigned to it by the CEAB, it became apparent that the goal of the 30 by 30 initiative is one component of a larger, global movement towards the adoption of the principles of equity, diversity and inclusion (EDI). [...] In addition, members of the Working Group self-identified specific areas of interest and split into sub-groups to develop suggestions that were then presented to the entire Group for consideration, adoption or adaptation; these suggestions form the basis of the recommendations the Working Group is making to the CEAB. [...] Engineers Canada Page 14 of 31 Report on the 2022 consultation on the CEAB 30 by 30 Working Group Report Engineers Canada Page 15 of 31 Report on the 2022 consultation on the CEAB 30 by 30 Working Group Report Engineers Canada Page 16 of 31 Report on the 2022 consultation on the CEAB 30 by 30 Working Group Report Engineers Canada Page 17 of 31 Report on the 2022 consultation on the CEAB 30 by 30 W. [...] At this time, in pursuit of a more inclusive profession for women and other marginalized groups, the Working Group presents the revised recommendations and the final consultation report to the CEAB along with the following motion: That the CEAB endorse the report on the 2022 consultation on the CEAB 30 by 30 Working Group Report for its subsequent submission to the Engineers Canada Board for consi.
Authors
Related Organizations
- Pages
- 86
- Published in
- Canada
Table of Contents
- 4.3a Report on the 2022 consultation on the CEAB 30 by 30 WG Report 1
- 1. Introduction 3
- 1.1. Description of the issue requiring consultation 3
- 1.2. The CEAB 30 by 30 Working Group 3
- 2. 2022 Consultation scope and methodology 5
- 2.1. Consultation objectives 5
- 2.2. Consultation approach 5
- 2.3. Website statistics 7
- 2.4. Interest holders 7
- 2.5. Key questions asked of each interest holder 7
- 3. Findings 8
- 3.1 List of interest holders that provided feedback 8
- 3.2 Summary of consultation feedback 11
- Proportion of feedback received from different sources of interest holders: 11
- Proportion of feedback items received grouped by recommendations of the Working Group report to which it applied: 12
- Engineering Deans Canada’s feedback on the Working Group revised recommendations 13
- 3.3 Revised recommendations 14
- 4. Recommendations to CEAB 20
- 5. Definitions 21
- 6. Appendices 22
- Appendix 1: CEAB 30 by 30 Working Group Report 22
- Appendix 2: Engineers Canada’s Consultation Process 23
- Appendix 3: Consultation Invitation Email 24
- Appendix 4: Consultation Presentation Slide Deck 27
- Appendix 5: Feedback Items Received Through Consultation 31
- CEAB_30_by_30_Consultation-Feedback-Items 32
- Cover 32
- Table of Contents 33
- 1. 30x30 Consultation Feedback Recommendation 1 34
- 2. 30x30 Consultation Feedback Recommendation 2 36
- 3. 30x30 Consultation Feedback Recommendation 3 39
- 4. 30x30 Consultation Feedback Recommendation 4 41
- 5. 30x30 Consultation Feedback Recommendation 5 44
- 6. 30x30 Consultation Feedback Recommendation 6 46
- 7. 30x30 Consultation Feedback Recommendation 7 48
- 8. 30x30 Consultation Feedback Recommendation 8 50
- 9. 30x30 Consultation Feedback Recommendation 9 51
- 10. 30x30 Consultation Feedback Recommendation 10 53
- 11. 30x30 Consultation Feedback Recommendation 11 55
- 12. 30x30 Consultation Feedback Recommendation 12 57
- 13. 30x30 Consultation Feedback Recommendation 13 59
- 14. 30x30 Consultation Feedback Recommendation 14 60
- 15. 30x30 Consultation Feedback Recommendation 15 62
- 16. 30x30 Consultation Feedback Recommendation 16 65
- 17. 30x30 Consultation Feedback Recommendation 17 67
- 18. 30x30 Consultation Feedback Recommendation 18 68
- 19. 30x30 Consultation Feedback Recommendation 19 69
- G. 30x30 Consultation General Feedback 71