cover image: Previous set of All Specifications and Drawings Feb 21 2019

Premium

20.500.12592/fs77p5

Previous set of All Specifications and Drawings Feb 21 2019

7 Feb 2019

Payment to include replacement of signs and barricades damaged by causes not under the control of the Contractor, maintenance of existing road surfaces outside site, supply of flagmen, inspection and maintenance of detour signs and barricades inside and outside site. [...] City of Saskatoon GENERAL REQUIREMENTS DIVISION 1 Temporary Facilities Section 01025 01025_Jan04_2005.pdf Page 13 of 13 2.15.8 Construct, sign, and maintain detours to RTAC standards, City of Saskatoon Traffic Control Manual and to approval of the Engineer. [...] City of Saskatoon EARTHWORKS DIVISION 2 Excavation and Embankment Construction Section 02005 02005_Dec22_2009.pdf Page 3 of 10 1.3.3 Excavation to Waste: Excavation of all materials of whatever nature, excluding materials defined as topsoil or rock found by the Engineer to be unsuitable or in excess of requirements for embankment construction. [...] City of Saskatoon EARTHWORKS DIVISION 2 Excavation and Embankment Construction Section 02005 02005_Dec22_2009.pdf Page 4 of 10 02005-3 EQUIPMENT All tools, machinery, plant and equipment used in handling materials and executing any part of the work, shall be subject to the approval of the Engineer. [...] All such equipment shall be maintained in efficient working order and where any of the machinery, plant or equipment is found to be unsatisfactory, it shall be improved or replaced by the Contractor to the satisfaction of the Engineer.
laws and regulations

Authors

isWayneK

Pages
1008
Published in
Canada

Related Topics

All