cover image: Previous set of All Specifications and Drawings Feb 12 2021

Premium

20.500.12592/7n8h44

Previous set of All Specifications and Drawings Feb 12 2021

12 Feb 2021

Supply and installation and subsequent dismantling and removal of materials and equipment required for maintenance of traffic. [...] Payment to include replacement of signs and barricades damaged by causes not under the control of the Contractor, maintenance of existing road surfaces outside site, supply of flagmen, inspection and maintenance of detour signs and barricades inside and outside site. [...] Should the Contractor fail to notify the Engineer at commencement of the work and should it subsequently appear that the work may be delayed for the above reasons, the Engineer reserves the right to substitute more readily available materials or equipment of similar character, at no increase in Contract price. [...] All such equipment shall be maintained in efficient working order and where any of the machinery, plant or equipment is found to be unsatisfactory, it shall be improved or replaced by the Contractor to the satisfaction of the Engineer. [...] The Contractor shall be responsible to separate all concrete rubble, asphalt pavement, rock, rubbish, trees, etc., from the earth material and shall dispose of the material to the Earthworks Division 2 Excavation and Embankment Construction Section 02005 Revised Date: 2009-12-22 Page 5 of 8 satisfaction of the Engineer at the designated location.

Authors

City of Saskatoon

Pages
934
Published in
Canada