cover image: Phase 2 Initial Borehole Drilling and Testing, Ignace Area. WP10 – Geological Integration Report for

20.500.12592/hcb88s

Phase 2 Initial Borehole Drilling and Testing, Ignace Area. WP10 – Geological Integration Report for

22 Feb 2023

The objective of the Geological Integration Report is to summarize the main geological findings and provide an initial interpretation of the rock type and structural characteristics of the geosphere intersected by borehole IG_BH02, including delineation of rock unit and structural unit domains. [...] The overall program, described in the Initial Borehole Characterization Plan (Golder, 2017) includes activities related to: the mobilization and set up of the borehole drilling site, the recovery and logging of the bedrock core, drilling water management and groundwater sampling, borehole geophysical and hydraulic testing, laboratory testing, and on-going monitoring activities at the borehole. [...] The scope of this Single Borehole Data Integration report is summarized in the following sections: • Section 1 provides the report introduction and includes the summary of technical objectives and scope of the sections in the report. [...] Due to the steel casing, the majority of the televiewer surveys were terminated at the base of the casing and are missing data from the first ~75 m. [...] The general consistency in character of the recovered core with the bedrock identified on the ground surface indicates that the biotite granodiorite-tonalite encountered in IG_BH02 is part of the same granodiorite-tonalite bedrock unit that was mapped at ground surface in the vicinity of the borehole (Golder and PGW, 2017).

Authors

DesRoches;Waffle, Parmenter

Pages
138
Published in
Canada

Tables

All