cover image: Phase 2 Initial Borehole Drilling and Testing, Ignace Area. WP10 – Geological Integration Report for

20.500.12592/2m2n04

Phase 2 Initial Borehole Drilling and Testing, Ignace Area. WP10 – Geological Integration Report for

21 Feb 2023

The scope of this Single Borehole Data Integration report is summarized in the following sections: 2 Section 1 provides the report introduction and includes the summary of technical objectives and scope of the sections in the report. [...] The grouping of the televiewer paths could be due to the different tensions in the cable between lowering the tool and pulling the tool upwards, and the fact that the televiewers are never stationary (continuous measurement). [...] Due to the steel casing, the majority of the televiewer surveys were terminated at the base of the casing and are missing data from the first 69 m. [...] The comparison indicates that the largest uncertainty between the measurements is in the northing direction and is approximately 1.2 m (standard deviation for the televiewer surveys) at the end of the borehole. [...] The true vertical depth of the borehole is 1000.86 mbgs and terminates 27.41 m to the west and 1.88 m to the south of the collar.

Authors

DesRoches;Waffle, Parmenter

Pages
143
Published in
Canada

Tables

All