cover image: Supplementary General Conditions CCDC14 Design Build - Developer Procured Land

20.500.12592/q45n19

Supplementary General Conditions CCDC14 Design Build - Developer Procured Land

17 May 2023

If, in the opinion of the Consultant or the Owner, the Design-Builder makes use of methods or appliances which will not permit the proper execution of the Work or employs inefficient or insufficient labour which will not permit the proper execution of the Work within the Contract Time, the Consultant or the Owner may notify the Design-Builder to improve its construction methods whereupon the Desig. [...] Samples shall be labelled as to origin and intended use in the Work and shall conform to the requirements of the Contract Documents.” Page 13 of 33 P-GFP-2023 GC3.12 USE OF THE WORK Add: “3.12.1 The Owner reserves the right to take possession of and use any completed or partially completed portion of the Work, regardless of the date of Substantial Performance of the Work, providing it does not int. [...] With respect to a request from the Design-Builder for a review by the Payment Certifier for issuance of the Certificate of Completion for the Work in its entirety, the Payment Certifier will, in addition to making an inspection and assessment of the Work to verify the validity of the request, establish a list of all deficient and incomplete items of work confirmed or provided by the Consultant, in. [...] Housing with respect to the same; all landscaping has been completed in accordance Page 19 of 33 P-GFP-2023 with the Contract Documents to the satisfaction of the Consultant and the Owner; and when the Design-Builder has submitted to the Owner all of the following: .1 Current certification by the Workers Compensation Board that the Design-Builder and all Subcontractors are in good standing; .2 Pro. [...] 9.2.2 The Design-Builder shall be deemed to have control and management of the Place of the Work with respect to any toxic or hazardous substances which are on or in the Place of the Work or may be brought on to the Place of the Work by the Design-Builder or the Subcontractors.

Authors

BC Housing

Pages
33
Published in
Canada

Tables