cover image: 09 2023-Operating-Plan Proposed-Fee-Changes

Premium

20.500.12592/z50z9q

09 2023-Operating-Plan Proposed-Fee-Changes

3 Jan 2023

PROPERTY DEVELOPMENT FILE MANAGEMENT FEES 5.0% of the total gross cost for 5.0% of the total gross cost for Plan of subdivision application reviewing and inspecting reviewing and inspecting landscape works landscape works 5.0% of the total gross cost for 5.0% of the total gross cost for reviewing and inspecting reviewing and inspecting Site plan application landscape works (minimum landscape works. [...] $600.00, if the design capacity $600.00, if the design capacity of the facility is more than 15 of the facility is more than 15 A subsurface disposal facility, including the expansion of an existing facility that involves an cubic metres per day and not cubic metres per day and not increase in the rated capacity of the facility. [...] more than 50 cubic metres per more than 50 cubic metres per day day $1,500.00, if the design $1,500.00, if the design capacity of the facility is more capacity of the facility is more A subsurface disposal facility, including the expansion of an existing facility that involves an than 15 cubic metres per day than 15 cubic metres per day increase in the rated capacity of the facility. [...] and not more than 50 cubic and not more than 50 cubic metres per day metres per day $3,000.00, if the design $3,000.00, if the design A subsurface disposal facility, including the expansion of an existing facility that involves an capacity of the facility is more capacity of the facility is more increase in the rated capacity of the facility. [...] EQUIPMENT RENTALS 307 SCHEDULE J ROADS, PARKS AND FLEET DEPARTMENT 2022 2023 ITEM APPROVED PROPOSED FEE FEE $109.26 per hour plus the cost $112.53 per hour plus the cost Gradall/Backhoe of the operator of the operator $391.87 per hour plus the cost $403.63 per hour plus the cost Hydro Vac (including 3 operators and truck) of the operator of the operator $63.03 per hour plus the cost $64.92 per hou.

Authors

John.Kuehl

Pages
43
Published in
Canada

Tables

All