cover image: Site Plan Engineering Guidelines - Engineering Division Development Services Department

Premium

20.500.12592/xz9dj6

Site Plan Engineering Guidelines - Engineering Division Development Services Department

2 Feb 2023

Upon completion of the project a letter of certification and Site Works Notification Form (found on the City’s website) is required from the Professional Engineer who completed the grading, servicing and stormwater management design for the site prior to release of the LC. [...] It is the Engineer’s responsibility to ensure the accuracy of the existing plan shown on the drawings submitted to the City for review. [...] It is the Engineer’s responsibility to ensure the accuracy of the placement of all services on the drawings submitted to the City for review. [...] 11) The final connection must be made in a manner to satisfy the following: • The water service must be dewatered in a manner to ensure the water level in the trench is always below the invert of the exposed water pipe. [...] The following information is required to be incorporated into all stormwater management reports: 1) Name of the project, the municipal address, and date of the report to be shown on the front cover.

Authors

Catalog1

Pages
44
Published in
Canada