N PLAN ELEVATION SECTION *

Premium

20.500.12592/8nmq41

N PLAN ELEVATION SECTION *

6 Sep 2022

EXISTING CULVERT THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS FOR THE CONSULTANT TO REDESIGN THE ABUTMENTS AND AMEND THE CONTRACT DOCUMENTS SHOULD ANOTHER PRE-ENGINEERED BRIDGE SUPPLIER BE PLAN UTILIZED. [...] THE CONTRACTOR SHALL PROVIDE A CL BRIDGE THOROUGHLY PLANNED DEBRIS CONTAINMENT AND PATH SYSTEM TO BE INSTALLED PRIOR TO START OF WORK, TO PREVENT DEBRIS FROM FALLING INTO THE WATERCOURSE. [...] THE CHARPY IMPACT CITY OF WINDSOR, ONTARIO NOTE: ENERGY REQUIREMENTS SHALL BE 27 JOULES AND THE TEST TEMPERATURE · ABUTMENT FOOTINGS ARE TO BE CONSTRUCTED ON 1m ENGINEERED FILL ASSECTION 1 SHALL BE -30°C SHOWN ON THE CONTRACT DRAWINGS. [...] N/A As Noted S2 P:\2018\For London Office\SWW187112 - Hawthorne\DWG\SWW187112 - S3 -Hawthorne.dwg; 12/20/2018; Kallas, Khaled X X X X X X X S X X S X X X S S S S S S S S S S S S S S S S S S S 2440 LITTLE RIVER FLOW S S S S S S S S S S S S S S S S S S S S S X X X X X X X X X X X X X X X X Key Plan NOTE: N LITTLE RIVER TO BE READ IN CONJUNCTION WITH CONTRACT PACKAGE & ENVIRONMENTAL MITIGATION IDENTI. [...] ALL SPILLS ARE TO BE REPORTED TO THE ONTARIO MINISTRY OF ABUTMENT EXCAVATION TO BACKFILL, GRADING AND EMBANKMENT STABILIZATION SURVEYED FOR THE PRESENCE OF SAR SNAKES EACH DAY PRIOR TO (RE)INITIATING THE ENVIRONMENT, CONSERVATION AND PARKS (MECP) SPILLS ACTION CENTRE (SAC) WITH TOPSOIL AND SEED'.
Pages
3
Published in
Canada