Pontiac Pumping Station Capacity Upgrades - Schedule 'C' Municipal Class

Premium

20.500.12592/w2ss5f

Pontiac Pumping Station Capacity Upgrades - Schedule 'C' Municipal Class

17 Mar 2023

• Phase 4 includes the completion of the ESR and placing it on the public record, notification to the public and review agencies of completion of the Class EA and a 30-day review period providing the opportunity to request the Minister to require a proponent to comply with Part II of the EA Act (which addresses individual EAs) before proceeding with the project. [...] The Pontiac Pumping Station generally services the East Riverside area and is bounded by Tecumseh Road East in the south, the Detroit River in the north, Lauzon Road on the west and Chateau Avenue on the east. [...] The topography of the land in the study area is relatively low lying and flat with a fall of 2 to 2.5 metres per kilometre from the south limit of the study area to the river. [...] 2.4.6 Marine Life The Study Area includes the Little River and the embayment connecting the Little River and the Pumping Station, which serves as the outlet for the proposed pumping station and supports a limited variety of marine and aquatic species. [...] Upgrade the hydraulic capacity of the Pontiac Pumping Station to effectively release stormwater to the Little River and reduce the HGL within the stormwater system to meet the appropriate level of service.

Authors

Li, Jian

Pages
500
Published in
Canada